EOSL database / APC by Schneider Electric
APC by Schneider Electric — End of Service Life
30 APC by Schneider Electric models in the database: 9 are already end-of-support, 0 reach EOSL within 12 months. Categories: UPS / Power.
| Model | Product line | Category | EOSL date | Status |
|---|---|---|---|---|
| SMT-Serie | Smart-UPS Tower | UPS / Power | — | Date pending |
| SMC-Serie (750VA bis 3000VA) | Smart-UPS Tower | UPS / Power | — | Date pending |
| Smart-UPS Rack SMX | Smart-UPS Rack | UPS / Power | — | End of support |
| SRT 1500VA-10kVA Rack-mounted | Smart-UPS Rack | UPS / Power | — | Date pending |
| SRT 5kVA | Smart-UPS On-Line / SRT | UPS / Power | — | Date pending |
| SRT 6kVA | Smart-UPS On-Line / SRT | UPS / Power | — | Date pending |
| SRT 8kVA | Smart-UPS On-Line / SRT | UPS / Power | — | Date pending |
| SRT 10kVA | Smart-UPS On-Line / SRT | UPS / Power | — | Date pending |
| Symmetra LX 4kVA bis 16kVA | Symmetra LX | UPS / Power | 31/12/2024 | End of support |
| Symmetra PX 10kW | Symmetra PX | UPS / Power | — | End of support |
| 20kW | Symmetra PX | UPS / Power | — | Date pending |
| 40kW | Symmetra PX | UPS / Power | — | Date pending |
| 48kW | Symmetra PX | UPS / Power | — | Date pending |
| 80kW | Symmetra PX | UPS / Power | — | Date pending |
| 100kW | Symmetra PX | UPS / Power | — | Date pending |
| 160kW | Symmetra PX | UPS / Power | — | Date pending |
| 250kW | Symmetra PX | UPS / Power | — | Date pending |
| Symmetra PX 80/100/160 (1. Gen) | Symmetra PX (älter) | UPS / Power | — | End of support |
| Galaxy VS 10-50kVA | Galaxy VS / VM | UPS / Power | — | End of support |
| Galaxy VM 75-225kVA | Galaxy VS / VM | UPS / Power | 01/01/2035 | Supported |
| Galaxy VL 200-500kW | Galaxy VL | UPS / Power | — | End of support |
| Galaxy 3500 | Galaxy 3500/5500/7000 (älter) | UPS / Power | — | End of support |
| 5500 | Galaxy 3500/5500/7000 (älter) | UPS / Power | — | End of support |
| 7000 | Galaxy 3500/5500/7000 (älter) | UPS / Power | — | End of support |
| Rack PDU | NetShelter PDUs | UPS / Power | — | Date pending |
| Switched | NetShelter PDUs | UPS / Power | — | Date pending |
| Metered | NetShelter PDUs | UPS / Power | — | Date pending |
| Per-Outlet (AP-Serie) | NetShelter PDUs | UPS / Power | — | Date pending |
| Easy UPS On-Line SRV | Easy UPS | UPS / Power | — | Date pending |
| Easy UPS 3S | Easy UPS | UPS / Power | — | Date pending |
Partner recommendation · Ad
Keep running APC by Schneider Electric hardware after EOSL?
End of support doesn’t mean end of life: third-party maintenance (TPM) typically keeps APC by Schneider Electric systems running 30–70 % cheaper after the vendor support ends — with an SLA, spare parts and German-language support. Our partner TechCare Solutions reviews your installed base free of charge.
Request a free EOSL auditNotes on the data
Dates come from vendor announcements and are synchronised daily. “Date pending” means: the model is on record, but the vendor has not (yet) published a date or we don’t have it. Only the official vendor notices are binding. More in the guide What is EOSL?