EOSL database / Nvidia
Nvidia — End of Service Life
27 Nvidia models in the database: 10 are already end-of-support, 0 reach EOSL within 12 months. Categories: Server, Network.
| Model | Product line | Category | EOSL date | Status |
|---|---|---|---|---|
| DGX-1 (Pascal/Volta) | DGX-1 / DGX-2 (älter) | Server | 25/06/2023 | End of support |
| DGX-2 (Volta, 16x V100) | DGX-1 / DGX-2 (älter) | Server | 25/06/2023 | End of support |
| DGX A100 320GB | DGX A100 | Server | — | End of support |
| DGX A100 640GB | DGX A100 | Server | — | End of support |
| DGX H100 | DGX H100 / H200 | Server | — | Date pending |
| DGX H200 | DGX H100 / H200 | Server | — | Date pending |
| DGX GH200 | DGX GH200 / GB200 | Server | — | Date pending |
| DGX GB200 (NVL72) | DGX GH200 / GB200 | Server | — | Date pending |
| ConnectX-4 | ConnectX-4/-5/-6/-7 (Adapter) | Server | — | Date pending |
| ConnectX-5 | ConnectX-4/-5/-6/-7 (Adapter) | Server | — | Date pending |
| ConnectX-6 Dx | ConnectX-4/-5/-6/-7 (Adapter) | Server | — | Date pending |
| ConnectX-7 | ConnectX-4/-5/-6/-7 (Adapter) | Server | — | Date pending |
| BlueField-2 | BlueField DPU (Data Processing Unit) | Server | — | Date pending |
| BlueField-3 | BlueField DPU (Data Processing Unit) | Server | — | Date pending |
| Spectrum SN2000 | Spectrum Ethernet (SN-Serie) | Network | — | Date pending |
| SN3000 | Spectrum Ethernet (SN-Serie) | Network | — | Date pending |
| SN4000 | Spectrum Ethernet (SN-Serie) | Network | — | Date pending |
| SN5000 (10/25/100/200/400G) | Spectrum Ethernet (SN-Serie) | Network | — | Date pending |
| Quantum-1 (HDR 200G) | Quantum InfiniBand (QM-Serie) | Network | — | Date pending |
| Quantum-2 (NDR 400G) | Quantum InfiniBand (QM-Serie) | Network | — | Date pending |
| QM8700/QM9700 | Quantum InfiniBand (QM-Serie) | Network | — | Date pending |
| SX1012/SX1024/SX1036 | ältere Mellanox SX-/SB-Switches | Network | 31/12/2023 | End of support |
| SB7700/SB7800 | ältere Mellanox SX-/SB-Switches | Network | — | End of support |
| DGX-2H (920-22987-2511) | — | Server | 25/06/2023 | End of support |
| DGX-2 (920-22987-2510) | — | Server | 25/06/2023 | End of support |
| DGX-1 MaxQ (920-22787-2513) | — | Server | 25/06/2023 | End of support |
| DGX-1 V100 32GB (920-22787-2511) | — | Server | 25/06/2023 | End of support |
Partner recommendation · Ad
Keep running Nvidia hardware after EOSL?
End of support doesn’t mean end of life: third-party maintenance (TPM) typically keeps Nvidia systems running 30–70 % cheaper after the vendor support ends — with an SLA, spare parts and German-language support. Our partner TechCare Solutions reviews your installed base free of charge.
Request a free EOSL auditNotes on the data
Dates come from vendor announcements and are synchronised daily. “Date pending” means: the model is on record, but the vendor has not (yet) published a date or we don’t have it. Only the official vendor notices are binding. More in the guide What is EOSL?