EOSL database / Quantum / Scalar i500

Quantum Scalar i500 — End of Service Life

4 models of the Scalar i500 line in the database (Storage): 2 already end-of-support, 1 reach EOSL within 12 months — next date: 31/12/2026.

Short answer: Support for Quantum Scalar i500 ends per model: 2 of 4 models are already end of support (most recently Scalar i500 with HPE LTO-5 drives on 31/03/2023), the next support end is on 31/12/2026, the latest known one on 31/12/2027.

ModelCategoryEOSL dateStatus
Scalar i500 with LTO-7/LTO-8/LTO-9 tape drives Storage 31/12/2027 Supported
Scalar i500 with IBM LTO-6 drives Storage 31/12/2026 EOSL < 12 mo
Scalar i500 with LTO-5 drives Storage 31/03/2023 End of support
Scalar i500 with HPE LTO-5 drives Storage 31/03/2023 End of support

EOSL alert for Scalar i500

Free reminder before each support end of the 2 Scalar i500 models with an upcoming EOSL date — no more surprises at contract renewal.

Alert = double opt-in, one email per due date, unsubscribe any time. Quote = we pass your entries to TechCare Solutions GmbH (operator of EOSL365). Details: Privacy policy.

Partner recommendation · Ad

Keep running Scalar i500 systems after EOSL?

Third-party maintenance (TPM) typically keeps Quantum hardware running 30–70 % cheaper after vendor support ends — with an SLA, spare parts and German-language support. Our partner TechCare Solutions reviews your installed base free of charge.

Request a free EOSL audit

All Quantum lines at a glance: Quantum overview. What the statuses mean: What is EOSL?

FAQ

Can I keep running Scalar i500 systems after EOSL?

Yes. After the vendor's end of support, third-party maintenance (TPM) keeps Quantum hardware running with SLAs and spare parts — typically 30–70% below OEM list price. Security updates for firmware are no longer provided by the vendor, so plan network segmentation accordingly.

How do I get reminded before support ends?

Set a free EOSL alert on this page: we email you ahead of each support end of the 2 Scalar i500 models with an upcoming EOSL date — 90 days, 180 days or 12 months in advance.

More Quantum series

This series was grouped automatically from the model names in the vendor data.

Embed the status badge in your wiki or docs

HTML

Markdown (GitHub, GitLab, Confluence, Notion)

The badge updates automatically when the date changes — free to use.